- IPD delivered a turnkey, fully integrated, 660kW / 2.6MWh battery energy storage test facility for a global, utility scale system integrator.
- As early battery storage systems reach end-of-life, IPD works with utilities to decommission and deconstruction BESS
- IPD conducted energy, process, and hydraulic studies to help combat production interruptions triggered by high temperature alarms, then designed a new cooling tower system.
- IPD designed, tested, fabricated, and deployed custom tools for multiple clients to safely load batteries into containerized BESS in half the time.
- IPD's team worked with a global plastics manufacturer on a 100,000 sq ft mixed-use research, production, and warehouse facility.
- IPD led design, installation, and commissioning activities for a blackstart battery energy storage system (BESS) at a major utility in Louisiana
- IPD engineers worked closely with a major NYC power plant to install a new No. 4 fuel oil system on time and while managing multiple stakeholders.
- IPD's field technicians installed 5,000 AMPT 1500-volt DC string optimizers at multiple sites in New York.